Unlock the 85–95%
your BESS isn't using.

A BESS site has already paid for the hard parts: grid connection, transformer, BRP contract, regulatory standing. A co-located Gridbox plugs into that existing infrastructure and turns idle connection time into continuous compute revenue.

The Problem

Most of the BESS economics is sunk infrastructure that sits idle most of the time.

Large BESS installations carry significant upfront cost. Grid connections, transformers, land, BRP contracts, peak grid charge optimisation. Yet energy typically flows through these connections only 5–15% of the time. The rest is paid-for capacity, regulated and ready, doing nothing.

Our Solution

A Gridbox on the same connection, no new transformer, no allocation conflict.

The existing infrastructure can typically accommodate a Gridbox with limited additional electrical work, at a fraction of the standalone capex. Both assets qualify independently for FFR, FCR-D, and mFRR. There is no allocation competition.

01

Site assessment

We evaluate the existing connection, transformer headroom, and regulatory standing.

02

Low-voltage tie-in

The Gridbox connects into existing low-voltage infrastructure with minimal additional electrical work.

03

Independent qualification

Both assets qualify separately for FFR, FCR-D, mFRR with no allocation competition.

04

Continuous compute

The Gridbox runs on idle connection capacity, generating compute revenue 24/7.

Gridmetry offers BESS owners two options:

Your Benefits

Better economics than a standalone deployment, with longer battery life.

Capex per MW significantly lower than standalone

The costly shared infrastructure (connection, transformer, BRP) is already in place.

No ancillary service conflicts

FFR, FCR-D, mFRR: both assets qualify independently. Adding a Gridbox does not reduce the BESS's available capacity.

Continuous revenue on the 85–95% idle

When the BESS is not dispatched (most of the time) the Gridbox uses the connection for compute revenue.

Potential battery lifetime extension

Gridbox absorbing some of the energy-market activations means fewer cycles on the BESS, slowing degradation.

Talk to us about your BESS site.

Share the connection size, location, and existing programme participation. Gridmetry will model the co-location economics.