A BESS site has already paid for the hard parts: grid connection, transformer, BRP contract, regulatory standing. A co-located Gridbox plugs into that existing infrastructure and turns idle connection time into continuous compute revenue.
Large BESS installations carry significant upfront cost. Grid connections, transformers, land, BRP contracts, peak grid charge optimisation. Yet energy typically flows through these connections only 5–15% of the time. The rest is paid-for capacity, regulated and ready, doing nothing.
Typical grid connection utilisation at a BESS site. The rest is idle paid-for capacity.
Connection, transformer, civil works, BRP setup, already amortised against a low duty cycle.
Battery degradation is directly linked to charge/discharge cycles. Every market activation is a wear event.
The existing infrastructure can typically accommodate a Gridbox with limited additional electrical work, at a fraction of the standalone capex. Both assets qualify independently for FFR, FCR-D, and mFRR. There is no allocation competition.
We evaluate the existing connection, transformer headroom, and regulatory standing.
The Gridbox connects into existing low-voltage infrastructure with minimal additional electrical work.
Both assets qualify separately for FFR, FCR-D, mFRR with no allocation competition.
The Gridbox runs on idle connection capacity, generating compute revenue 24/7.
Gridmetry offers BESS owners two options:
A Gridbox on the same grid connection turns idle connection time into continuous compute revenue, as described above.
Layer Gridmetry's control software on top of your BESS to access more markets simultaneously, improve dispatch efficiency, and extend the revenue life of your asset.
The costly shared infrastructure (connection, transformer, BRP) is already in place.
FFR, FCR-D, mFRR: both assets qualify independently. Adding a Gridbox does not reduce the BESS's available capacity.
When the BESS is not dispatched (most of the time) the Gridbox uses the connection for compute revenue.
Gridbox absorbing some of the energy-market activations means fewer cycles on the BESS, slowing degradation.
Share the connection size, location, and existing programme participation. Gridmetry will model the co-location economics.